关于「真实进度展示规则:计数、截止、余量与退款的逐条审计」,《保证合约与预售成团》给出的定量结论是什么?

结论:这张表有两点值得注意。第一,线性外推在开头高估、在后段低估。第 3 天按计划进度有 42 单,线性外推得 196.0 单,远高于真实预期;第 12 天按计划进度有 84 单,线性外推只得 98.0 单,似乎凑不够,可是按剩余的预期 31.1 单计算,达标概率为 0.9989。第二,真实计数一旦落后计划,达标概率下降得很快:第 10 天若只有计划的八成,即 60 单,达标概率为 0.5464;第 12 天若只有计划的八成,即 67 单,只剩 0.3888。

数据口径:书中参数为示意;全部计算由书中程序生成。

English version

对照数据表

下表数字由本章 Python 程序原样打印,可重新运行复现。 程序只用 Python 标准库与结论吻合的打印值: 0.3888, 0.5464, 0.9989, 10, 12, 196.0

K = 100expected total = 115; P(made) at launch 0.9284
daym vs planmstraight linerest meanP(made | m)
30.834158.773.00.8101
31.042196.073.00.9692
31.250233.373.00.9982
70.84896.054.40.6454
71.061122.054.40.9878
71.273146.054.41.0000
100.86084.040.40.5464
101.075105.040.40.9962
101.290126.040.41.0000
120.86778.231.10.3888
121.08498.031.10.9989
121.2101117.831.11.0000
查看完整验算程序
# Chapter 6. p61: what a true progress count says. With the 14-day
# arrival profile of p32 (expected total 115, K = 100), a page that
# shows the real count m after day t lets anyone compute the honest
# chance of success P(N_rest >= K - m), N_rest ~ Poisson(rest of the
# expected total). A straight-line projection m x 14 / t ignores the
# closing burst and reads the quiet middle as failure. Rows: m equal
# to 0.8, 1.0 and 1.2 times the count expected by day t.
import math

K, MU = 100, 115.0
W = [3.0, 1.8] + [0.6] * 10 + [1.4, 2.6]


def pois_tail(k, mu):
    if k <= 0:
        return 1.0
    terms = [math.exp(j * math.log(mu) - mu - math.lgamma(j + 1))
             for j in range(k)]
    return 1.0 - math.fsum(terms)


if __name__ == "__main__":
    wsum = math.fsum(W)
    rates = [MU * w / wsum for w in W]
    print("K = {}  expected total = {:.0f}; P(made) at launch {:.4f}"
          .format(K, MU, pois_tail(K, MU)))
    print("day  m vs plan   m   straight line  rest mean  P(made | m)")
    for t in (3, 7, 10, 12):
        done = math.fsum(rates[:t])
        rest = math.fsum(rates[t:])
        for f in (0.8, 1.0, 1.2):
            m = int(round(f * done))
            line = m * len(W) / t
            print("{:3d} {:9.1f} {:5d} {:14.1f} {:10.1f} {:12.4f}".format(
                t, f, m, line, rest, pois_tail(K - m, rest)))

唯一数据源与引用

范雅福(Fan, Y.). (2026). 《保证合约预售成团阈值、退款承诺与公共品搭便车均衡母典》第 6 章「真实进度展示规则:计数、截止、余量与退款的逐条审计」(版本 1.0.0). 5D Library. DOI 待发布

DOI 待发布 · 专著页正式发布后上线(本站暂无专著页) · 5DL-B-316 · v1.0.0 · CC-BY-NC-ND-4.0

BibTeX
@book{fan2026316,
  author    = {Fan, Yafu},
  title     = {Assurance Contracts and Pre-Sale Group Thresholds: Refund Promises and Free-Riding Equilibria in Public Goods},
  year      = {2026},
  publisher = {5D Library},
  edition   = {1.0.0},
  note      = {DOI pending}
}

本书其他章节结论