关于「从核到众筹:理论精炼、实验室证据与平台数据」,《保证合约与预售成团》给出的定量结论是什么?
结论:模型的输出与论文的数字在形状上相当接近。模型中达到目标的比例为 0.469,论文中按计数算为 0.489;失败项目平均筹到目标的 0.112,论文为 0.103;失败项目中筹到三成以上的占 0.115,论文为 0.100;筹到一半以上的占 0.063,论文为 0.030;成功项目中超出不到百分之三的占 0.241,论文为 0.250;超出不到一成的占 0.503,与论文「约一半」相符。
数据口径:书中参数为示意;全部计算由书中程序生成。
对照数据表
下表数字由本章 Python 程序原样打印,可重新运行复现。 程序只用 Python 标准库与结论吻合的打印值: 0.030, 0.063, 0.100, 0.103, 0.112, 0.115
| model | Mollick 2014 | |
| projects | 4000 | 48526 |
| share reaching goal | 0.469 | 0.489 |
| failed: mean of goal | 0.112 | 0.103 |
| failed reaching 0.30 | 0.115 | 0.100 |
| failed reaching 0.50 | 0.063 | 0.030 |
| funded within 0.03 over | 0.241 | 0.250 |
| funded within 0.10 over | 0.503 |
查看完整验算程序
# Chapter 2. p22: "fail by a lot, succeed by a little". Mollick (2014)
# reports for 48,526 all-or-nothing Kickstarter projects that 23,719
# reached their goal, that failed projects raised on average 0.103 of
# the goal, that only 0.10 of failures reached 0.30 and 0.03 reached
# 0.50, and that a quarter of funded projects ended at most 0.03 over.
# A toy arrival model reproduces the shape: visitors arrive at a
# Poisson rate set by project appeal (lognormal); before the goal a
# visitor backs with a chance that rises with visible progress; once
# the goal is met the chance falls to 0.01 of its value. All model
# parameters are illustrative, and the model is not Mollick's own
# explanation. Fixed seed; standard library only.
import math
import random
PROJ, DAYS = 4000, 30.0
Q0, LIFT, AFTER, MED, SIG = 0.02, 40.0, 0.01, 15.0, 2.0
MOLLICK = (48526, 23719, 0.103, 0.10, 0.03, 0.25)
def campaign(rng):
# event by event: the backing rate is constant between pledges
goal = rng.randint(40, 200)
appeal = rng.lognormvariate(math.log(MED), SIG)
m, t = 0, 0.0
while True:
q = Q0 * (1 + LIFT * min(m / goal, 1.0))
if m >= goal:
q = q * AFTER
t = t + rng.expovariate(appeal * q)
if t > DAYS:
return m / goal
m = m + 1
if __name__ == "__main__":
rng = random.Random(20261113)
ratios = [campaign(rng) for _ in range(PROJ)]
win = [r for r in ratios if r >= 1.0]
lose = [r for r in ratios if r < 1.0]
n, s, mf, f30, f50, q3 = MOLLICK
print(" model Mollick 2014")
print("projects {:6d} {:6d}".format(PROJ, n))
print("share reaching goal {:.3f} {:.3f}".format(
len(win) / PROJ, s / n))
print("failed: mean of goal {:.3f} {:.3f}".format(
math.fsum(lose) / len(lose), mf))
print("failed reaching 0.30 {:.3f} {:.3f}".format(
len([r for r in lose if r >= 0.30]) / len(lose), f30))
print("failed reaching 0.50 {:.3f} {:.3f}".format(
len([r for r in lose if r >= 0.50]) / len(lose), f50))
print("funded within 0.03 over {:.3f} {:.3f}".format(
len([r for r in win if r <= 1.03]) / len(win), q3))
print("funded within 0.10 over {:.3f}".format(
len([r for r in win if r <= 1.10]) / len(win)))唯一数据源与引用
范雅福(Fan, Y.). (2026). 《保证合约预售成团阈值、退款承诺与公共品搭便车均衡母典》第 2 章「从核到众筹:理论精炼、实验室证据与平台数据」(版本 1.0.0). 5D Library. DOI 待发布
DOI 待发布 · 专著页正式发布后上线(本站暂无专著页) · 5DL-B-316 · v1.0.0 · CC-BY-NC-ND-4.0
BibTeX
@book{fan2026316,
author = {Fan, Yafu},
title = {Assurance Contracts and Pre-Sale Group Thresholds: Refund Promises and Free-Riding Equilibria in Public Goods},
year = {2026},
publisher = {5D Library},
edition = {1.0.0},
note = {DOI pending}
}