What does Demo-First Closing and 48-Hour Delivery conclude, in numbers, about “Free Revisions and Scope Creep: Poisson Request Rates, the Change-Pricing Lock and the Choice of Contract”?
Answer: Chapter 5 shows that free revisions push nearly half of all orders below a margin of 4,000 units, while charging a single unit per change cuts the request rate from 6.0 to 2.49, and that a change-pricing lock stretches the range of a fixed price from 4.34 changes to 66.59.
Scope of the numbers: Its win rates, hours, margins, upfront shares, fees and prices are illustrative, counted in units that match no currency, client or real deal, and all calculations are generated by its programs. It is not legal advice and not individual business or financial advice; contract terms need review by a locally admitted lawyer.
Data table
The numbers below are printed verbatim by the chapter's Python program and can be reproduced by running it. standard-library Python onlyprinted values that match the answer: 2.49, 4000
| price lam E[req] E[hours] E[margin] P(m<4,000) +days | |||||
| 0 6.00 | 5.97 | 7.17 | 3,970 | 0.489 | 1.79 |
| 1 2.49 | 2.48 | 2.98 | 4,224 | 0.095 | 0.74 |
| 30 2.15 | 2.14 | 2.57 | 4,310 | 0.028 | 0.64 |
| 60 1.85 | 1.84 | 2.22 | 4,377 | 0.007 | 0.56 |
| 120 1.37 | 1.36 | 1.63 | 4,466 | 0.001 | 0.41 |
| 180 1.02 | 1.02 | 1.22 | 4,509 | 0.000 | 0.31 |
| cost of one change at 1.2 h x 60 = 72 units | |||||
| jump at zero: lam(0) / lam(0+) = 2.41 | |||||
Show the full program
# Chapter 5. p51: free revisions, request rates and margin erosion.
# Change requests per project are Poisson. At a price of zero the rate
# jumps (the zero-price effect of Shampanier, Mazar and Ariely 2007 is
# the qualitative input; the size of the jump here is illustrative):
# lam(0) = 6.0, lam(p) = 2.5 * exp(-p / 200) for p > 0 units.
# Each change takes Exp(mean 1.2) builder hours at 60 units an hour.
# Build margin 4,400 units; the price p is charged per change.
# Changes are worked in a 4-hour daily slot after handover, so extra
# calendar days = change hours / 4. Fixed seed, N = 20,000 projects.
import math
import random
rng = random.Random(20261120)
N = 20000
RATE, MARGIN, SLOT = 60, 4400, 4.0
def lam(p):
return 6.0 if p == 0 else 2.5 * math.exp(-p / 200)
def poisson(mu):
lim, k, prod = math.exp(-mu), 0, rng.random()
while prod > lim:
k += 1
prod *= rng.random()
return k
print("price lam E[req] E[hours] E[margin] P(m<4,000) +days")
for p in (0, 1, 30, 60, 120, 180):
mus, hrs, low, reqs = [], [], 0, 0
for _ in range(N):
n = poisson(lam(p))
reqs += n
h = math.fsum(rng.expovariate(1 / 1.2) for _ in range(n))
m = MARGIN + n * p - RATE * h
mus.append(m)
hrs.append(h)
if m < 4000:
low += 1
print("{:>5} {:>4.2f} {:>6.2f} {:>8.2f} {:>9,.0f} {:>10.3f} {:>5.2f}"
.format(p, lam(p), reqs / N, math.fsum(hrs) / N,
math.fsum(mus) / N, low / N, math.fsum(hrs) / N / SLOT))
print("cost of one change at 1.2 h x 60 = {:.0f} units".format(1.2 * RATE))
print("jump at zero: lam(0) / lam(0+) = {:.2f}".format(lam(0) / lam(1)))Single source and citation
Fan, Y. (2026). Demo-First B2B Closing, Forty-Eight-Hour Turnkey System Delivery and Scope-Creep Containment (Version 1.0.0), Chapter 5: Free Revisions and Scope Creep: Poisson Request Rates, the Change-Pricing Lock and the Choice of Contract. 5D Library. DOI pending
DOI pending · monograph page goes live after publication · 5DL-B-368 · v1.0.0 · CC-BY-NC-ND-4.0
BibTeX
@book{fan2026368,
author = {Fan, Yafu},
title = {Demo-First B2B Closing, Forty-Eight-Hour Turnkey System Delivery and Scope-Creep Containment},
year = {2026},
publisher = {5D Library},
edition = {1.0.0},
note = {DOI pending}
}Other chapter answers in this book
- Chapter 1 · The Break-Even Line of Demo-First Selling: Win-Rate Jumps, the Endowment Dispute and Name Personalisation
- Chapter 2 · How Complete Should a Preview Be? The Saturating Win-Rate Curve, the Optimal Completeness and Preview Compliance
- Chapter 3 · Forty-Eight Hours Is a Distribution: Sums of Module Hours, the Probability of Being on Time and the Planning Fallacy
- Chapter 4 · Put the Buffer at the End of the Chain: Critical Chain, Fat-Tailed Modules and the Limits of Intake
- Chapter 6 · Upfront Payments, Milestones and the Hosting Retainer: Expected Cash and Retention Without Hostages
- Chapter 7 · Classical Sources East and West: Mozi on Gongshu Ban, the Kaogong ji, the Gospel of Luke and Vitruvius
- Chapter 8 · The Empirical Loop: Actuarial Tools and Execution Checklist for Demo and Delivery