What does Demo-First Closing and 48-Hour Delivery conclude, in numbers, about “The Empirical Loop: Actuarial Tools and Execution Checklist for Demo and Delivery”?
Answer: The actuarial tool combines the formulas of the first six chapters into one checker, and run without arguments it reproduces the demonstration above. The execution checklist sets out the ledger fields, the daily, weekly and monthly rhythm, and what to do, and what to stop, when each threshold is crossed. The pre-registered tests fix sample sizes and refutation conditions in advance: 231 pitches per arm for the preview jump, 59 orders for the forty-eight-hour promise and 6 orders per arm for the zero-price effect.
Scope of the numbers: Its win rates, hours, margins, upfront shares, fees and prices are illustrative, counted in units that match no currency, client or real deal, and all calculations are generated by its programs. It is not legal advice and not individual business or financial advice; contract terms need review by a locally admitted lawyer.
Data table
The numbers below are printed verbatim by the chapter's Python program and can be reproduced by running it. standard-library Python onlyprinted values that match the answer: 231, 59
| H1 preview jump 0.20 | 0.30: n = 231 per arm, 462 pitches |
| at 12 pitches a month | 38.5 months |
| H2 on time 0.85 vs 0.95: n | 59 builds, reject if >= 55 on time |
| exact alpha 0.0469, power 0.8281, 9.8 months at 6 builds | |
| H3 change rate 6.0 vs 2.5 per project: n | 6 projects per arm |
| refute H1 if the upper 95 % bound of the jump < 0.0409 | |
| refute H2 if fewer than 55 of 59 builds land inside 48 hours |
Show the full program
# Chapter 8. p82: sample sizes for the pre-registered tests.
# H1 (preview jump): win rate 0.20 without a preview vs 0.30 with one,
# one-sided alpha 0.05, power 0.80; the refuting result is an upper
# 95 % bound of the jump below the break-even line 0.0409.
# H2 (48-hour promise): exact binomial test of on-time share 0.85 vs
# 0.95; smallest n whose rejection region keeps alpha <= 0.05 and
# reaches power >= 0.80.
# H3 (zero-price creep): Poisson change counts per project, 6.0 when
# free vs 2.5 when priced, square-root transform, two-sided 0.05.
# Deal flow (12 pitches, 6 builds a month) is illustrative.
import math
from statistics import NormalDist
Z = NormalDist()
def n_two_prop(p0, p1, alpha=0.05, power=0.80):
za, zb = Z.inv_cdf(1 - alpha), Z.inv_cdf(power)
pbar = (p0 + p1) / 2
num = (za * math.sqrt(2 * pbar * (1 - pbar)) +
zb * math.sqrt(p0 * (1 - p0) + p1 * (1 - p1))) ** 2
return math.ceil(num / (p1 - p0) ** 2)
def binom_tail(n, k, p):
return math.fsum(math.comb(n, j) * p ** j * (1 - p) ** (n - j)
for j in range(k, n + 1))
def exact_n(p0, p1, alpha=0.05, power=0.80):
for n in range(10, 400):
for k in range(n + 1):
if binom_tail(n, k, p0) <= alpha:
if binom_tail(n, k, p1) >= power:
return n, k, binom_tail(n, k, p0), binom_tail(n, k, p1)
break
return None
n1 = n_two_prop(0.20, 0.30)
print("H1 preview jump 0.20 -> 0.30: n = {} per arm, {} pitches".format(
n1, 2 * n1))
print(" at 12 pitches a month: {:.1f} months".format(2 * n1 / 12))
n2, k2, a2, b2 = exact_n(0.85, 0.95)
print("H2 on time 0.85 vs 0.95: n = {} builds, reject if >= {} on time"
.format(n2, k2))
print(" exact alpha {:.4f}, power {:.4f}, {:.1f} months at 6 builds"
.format(a2, b2, n2 / 6))
l0, l1 = 6.0, 2.5
n3 = math.ceil((Z.inv_cdf(0.975) + Z.inv_cdf(0.80)) ** 2 /
(2 * (math.sqrt(l0) - math.sqrt(l1)) ** 2))
print("H3 change rate 6.0 vs 2.5 per project: n = {} projects per arm"
.format(n3))
print("refute H1 if the upper 95 % bound of the jump < 0.0409")
print("refute H2 if fewer than {} of {} builds land inside 48 hours"
.format(k2, n2))Single source and citation
Fan, Y. (2026). Demo-First B2B Closing, Forty-Eight-Hour Turnkey System Delivery and Scope-Creep Containment (Version 1.0.0), Chapter 8: The Empirical Loop: Actuarial Tools and Execution Checklist for Demo and Delivery. 5D Library. DOI pending
DOI pending · monograph page goes live after publication · 5DL-B-368 · v1.0.0 · CC-BY-NC-ND-4.0
BibTeX
@book{fan2026368,
author = {Fan, Yafu},
title = {Demo-First B2B Closing, Forty-Eight-Hour Turnkey System Delivery and Scope-Creep Containment},
year = {2026},
publisher = {5D Library},
edition = {1.0.0},
note = {DOI pending}
}Other chapter answers in this book
- Chapter 1 · The Break-Even Line of Demo-First Selling: Win-Rate Jumps, the Endowment Dispute and Name Personalisation
- Chapter 2 · How Complete Should a Preview Be? The Saturating Win-Rate Curve, the Optimal Completeness and Preview Compliance
- Chapter 3 · Forty-Eight Hours Is a Distribution: Sums of Module Hours, the Probability of Being on Time and the Planning Fallacy
- Chapter 4 · Put the Buffer at the End of the Chain: Critical Chain, Fat-Tailed Modules and the Limits of Intake
- Chapter 5 · Free Revisions and Scope Creep: Poisson Request Rates, the Change-Pricing Lock and the Choice of Contract
- Chapter 6 · Upfront Payments, Milestones and the Hosting Retainer: Expected Cash and Retention Without Hostages
- Chapter 7 · Classical Sources East and West: Mozi on Gongshu Ban, the Kaogong ji, the Gospel of Luke and Vitruvius