关于「零价改稿与需求蔓延:泊松请求率、变更计价锁与合同选型」,《演示先行与四十八小时交付》给出的定量结论是什么?

结论:第五章说明,免费改稿让近一半订单毛利跌破 4,000 单位,只要每次收 1 单位,请求率就从 6.0 次降到 2.49 次;变更计价锁把固定价的适用范围从 4.34 次变更延伸到 66.59 次。

数据口径:书中的赢率、工时、毛利、首付比例、月费与价格均为示意参数,以「单位」计,不对应任何币种、真实客户或真实成交;全部计算由书中程序生成。 本书不是法律意见,也不是个人化经营或理财建议,合同条款须由当地执业律师审阅;书中不写威胁催促、不写会重置的倒计时、不写收益承诺,推荐奖励只写单层。

English version

对照数据表

下表数字由本章 Python 程序原样打印,可重新运行复现。 程序只用 Python 标准库与结论吻合的打印值: 2.49, 4000

price lam E[req] E[hours] E[margin] P(m<4,000) +days
0 6.005.977.173,9700.4891.79
1 2.492.482.984,2240.0950.74
30 2.152.142.574,3100.0280.64
60 1.851.842.224,3770.0070.56
120 1.371.361.634,4660.0010.41
180 1.021.021.224,5090.0000.31
cost of one change at 1.2 h x 60 = 72 units
jump at zero: lam(0) / lam(0+) = 2.41
查看完整验算程序
# Chapter 5. p51: free revisions, request rates and margin erosion.
# Change requests per project are Poisson. At a price of zero the rate
# jumps (the zero-price effect of Shampanier, Mazar and Ariely 2007 is
# the qualitative input; the size of the jump here is illustrative):
#   lam(0) = 6.0, lam(p) = 2.5 * exp(-p / 200) for p > 0 units.
# Each change takes Exp(mean 1.2) builder hours at 60 units an hour.
# Build margin 4,400 units; the price p is charged per change.
# Changes are worked in a 4-hour daily slot after handover, so extra
# calendar days = change hours / 4. Fixed seed, N = 20,000 projects.
import math
import random

rng = random.Random(20261120)
N = 20000
RATE, MARGIN, SLOT = 60, 4400, 4.0


def lam(p):
    return 6.0 if p == 0 else 2.5 * math.exp(-p / 200)


def poisson(mu):
    lim, k, prod = math.exp(-mu), 0, rng.random()
    while prod > lim:
        k += 1
        prod *= rng.random()
    return k


print("price  lam   E[req]  E[hours]  E[margin]  P(m<4,000)  +days")
for p in (0, 1, 30, 60, 120, 180):
    mus, hrs, low, reqs = [], [], 0, 0
    for _ in range(N):
        n = poisson(lam(p))
        reqs += n
        h = math.fsum(rng.expovariate(1 / 1.2) for _ in range(n))
        m = MARGIN + n * p - RATE * h
        mus.append(m)
        hrs.append(h)
        if m < 4000:
            low += 1
    print("{:>5} {:>4.2f}  {:>6.2f}  {:>8.2f}  {:>9,.0f}  {:>10.3f}  {:>5.2f}"
          .format(p, lam(p), reqs / N, math.fsum(hrs) / N,
                  math.fsum(mus) / N, low / N, math.fsum(hrs) / N / SLOT))
print("cost of one change at 1.2 h x 60 = {:.0f} units".format(1.2 * RATE))
print("jump at zero: lam(0) / lam(0+) = {:.2f}".format(lam(0) / lam(1)))

唯一数据源与引用

范雅福(Fan, Y.). (2026). 《半成品演示先行逼单、四十八小时交钥匙系统交付与防需求蔓延母典》第 5 章「零价改稿与需求蔓延:泊松请求率、变更计价锁与合同选型」(版本 1.0.0). 5D Library. DOI 待发布

DOI 待发布 · 专著页正式发布后上线(本站暂无专著页) · 5DL-B-368 · v1.0.0 · CC-BY-NC-ND-4.0

BibTeX
@book{fan2026368,
  author    = {Fan, Yafu},
  title     = {Demo-First B2B Closing, Forty-Eight-Hour Turnkey System Delivery and Scope-Creep Containment},
  year      = {2026},
  publisher = {5D Library},
  edition   = {1.0.0},
  note      = {DOI pending}
}

本书其他章节结论