What does Strata Commons and Sinking-Fund Ruin conclude, in numbers, about “Routing High-Intent Leads: Response Decay, Erlang Queues and Fair Rotation”?
Answer: Chapter 5 staffs a lead desk by the Erlang C formula, a fourth agent lifting the warmth left from 0.8802 to 0.9728, and a single queue served by the longest-idle agent yields 384.5 expected sales against 353.4 for strict rotation.
Scope of the numbers: All data are synthetic or illustrative, all calculations come from its programs, and it is general analysis, not legal, tax or investment advice; statutes await human review. Boxes separate evidence, runnable calculations (20 programs), classical sources and hypotheses.
Data table
The numbers below are printed verbatim by the chapter's Python program and can be reproduced by running it. standard-library Python onlyprinted values that match the answer: 0.8802, 0.9728
| A. load A | 2.0 Erlangs |
| agents P(wait) mean wait min P(wait< | 5 min) value left |
| 3 | 0.4444 4.44 0.7304 0.8802 |
| 4 | 0.1739 0.87 0.9360 0.9728 |
| 5 | 0.0597 0.20 0.9867 0.9934 |
| 6 | 0.0180 0.05 0.9976 0.9985 |
| 7 | 0.0048 0.01 0.9996 0.9997 |
| target P(wait< | 5 min) >= 0.90: smallest m = 4 |
| B. square-root staffing m = A + beta sqrt(A) | |
| beta 0.5: m | 3, P(wait) 0.4444 |
| beta 1.0: m | 4, P(wait) 0.1739 |
| beta 1.5: m | 5, P(wait) 0.0597 |
| beta 2.0: m | 5, P(wait) 0.0597 |
| C. desk hours: share off-hours 0.25, value at 6 h 0.0158 | |
| 3 agents in hours: blended value 0.6641 | |
| 5 agents in hours: blended value 0.7490 | |
| exponential off-hours wait, mean 6 h: value 0.0831 |
Show the full program
# Chapter 5. p52: staffing a lead desk with Erlang C.
# Leads arrive as Poisson, lambda = 12 an hour at peak; a first call and
# its log take 10 minutes on average (exponential), mu = 6 an hour, so
# the offered load is A = 2 Erlangs (illustrative). With m agents:
# C(m, A) = P(wait) = [A^m / m! * m / (m - A)] /
# [sum_{k<m} A^k / k! + A^m / m! * m / (m - A)]
# P(W > t) = C exp(-(m mu - lambda) t), E[W] = C / (m mu - lambda).
# Value left after the wait uses the two-speed curve of p51 (w = 0.9812,
# fast half-life 18.3 min, slow half-life 24 h), whose Laplace transform
# gives E[q(W)] in closed form. Panel C: a quarter of leads arrive when
# the desk is closed and wait 6 hours on average (illustrative).
import math
LAM, MU = 12.0, 6.0
W, KF, KS = 0.9812, math.log(2.0) / (18.3 / 60.0), math.log(2.0) / 24.0
def erlang_c(m, a):
if m <= a:
return 1.0
top = a ** m / math.factorial(m) * m / (m - a)
low = math.fsum(a ** k / math.factorial(k) for k in range(m))
return top / (low + top)
def value_left(m):
c = erlang_c(m, LAM / MU)
th = m * MU - LAM
lt = [(1.0 - c) + c * th / (th + k) for k in (KF, KS)]
return W * lt[0] + (1.0 - W) * lt[1]
if __name__ == "__main__":
a = LAM / MU
print("A. load A = {:.1f} Erlangs".format(a))
print(" agents P(wait) mean wait min P(wait<=5 min) value left")
for m in range(3, 8):
c = erlang_c(m, a)
th = m * MU - LAM
print(" {:>6} {:.4f} {:>13.2f} {:>14.4f} {:>10.4f}".format(
m, c, 60.0 * c / th, 1.0 - c * math.exp(-th * 5.0 / 60.0),
value_left(m)))
m = 1
while (1.0 - erlang_c(m, a) * math.exp(-(m * MU - LAM) * 5.0 / 60.0)
< 0.90):
m += 1
print(" target P(wait<=5 min) >= 0.90: smallest m = {}".format(m))
print("B. square-root staffing m = A + beta sqrt(A)")
for beta in (0.5, 1.0, 1.5, 2.0):
m = math.ceil(a + beta * math.sqrt(a))
print(" beta {:.1f}: m = {}, P(wait) {:.4f}".format(
beta, m, erlang_c(m, a)))
off = 0.25
night = W * math.exp(-KF * 6.0) + (1.0 - W) * math.exp(-KS * 6.0)
print("C. desk hours: share off-hours {:.2f}, value at 6 h"
" {:.4f}".format(off, night))
for m in (3, 5):
mix = (1.0 - off) * value_left(m) + off * night
print(" {} agents in hours: blended value {:.4f}".format(m, mix))
lt = [1.0 / (1.0 + k * 6.0) for k in (KF, KS)]
exp_night = W * lt[0] + (1.0 - W) * lt[1]
print(" exponential off-hours wait, mean 6 h: value {:.4f}".format(
exp_night))Single source and citation
Fan, Y. (2026). Strata-Title Commons Games, Sinking-Fund Ruin Actuarial Science and High-Intent Property Lead Routing (Version 1.0.0), Chapter 5: Routing High-Intent Leads: Response Decay, Erlang Queues and Fair Rotation. 5D Library. DOI pending
DOI pending · monograph page goes live after publication · 5DL-B-335 · v1.0.0 · CC-BY-NC-ND-4.0
BibTeX
@book{fan2026335,
author = {Fan, Yafu},
title = {Strata-Title Commons Games, Sinking-Fund Ruin Actuarial Science and High-Intent Property Lead Routing},
year = {2026},
publisher = {5D Library},
edition = {1.0.0},
note = {DOI pending}
}Other chapter answers in this book
- Chapter 1 · The Game of Late Payment: Conditional Cooperation, the Sanction Threshold and the Critical Arrears Rate
- Chapter 2 · The Actuarial Ruin of a Sinking Fund: Lumpy Works, Heavy-Tailed Costs and Finite-Horizon Ruin
- Chapter 3 · The Discount for a Delayed Strata Title: Risk-Neutral Pricing and Censored Data
- Chapter 4 · The Walking-Distance Gradient around Rail Stations: Reading a Meta-Analysis, Fitting and Confounding
- Chapter 6 · Central Control against Diverted Leads: the Inspection Game, Sampled Call-Backs and Tamper-Evident Logs
- Chapter 7 · Eastern and Western Classics Examined: Mencius on the Well-Field, Aristotle on Common Property
- Chapter 8 · Closing the Empirical Loop: the Quarterly Sinking-Fund Check-Up, the Monthly Routing Review and Pre-Registered Refutation