What does Solar Terms, Thermal Lag and Seasonal Demand conclude, in numbers, about “The Price of a Phase Error: Order Timing under the Newsvendor Model”?
Answer: Chapter 6 prices the error with the newsvendor model: ordering by the term names earns only 0.7196 of the best profit, less than flat ordering that ignores the season (0.7530), while the phase drift from climate change costs only 0.00147.
Scope of the numbers: Parameters in this book are illustrative; all calculations are generated by the book's programs; the book is non-personalised business guidance, and its order dates are demonstrations that promise no sales to any merchant. Chapter 4 shows that "the hottest day" is a statistic dominated by weather noise: in illustrative data the single hottest day misses by 16.81 days, while the harmonic phase from three years of daily data misses by only 1.25 days.
Data table
The numbers below are printed verbatim by the chapter's Python program and can be reproduced by running it. standard-library Python onlyprinted values that match the answer: 0.7196, 0.7530
| critical fractile 0.5714, z = 0.1800 | ||||
| assumed lag | error | season profit | share of best | fill rate |
| 0.0 | -32.5 | 41,694 | 0.7196 | 0.7766 |
| 10.0 | -22.5 | 47,923 | 0.8271 | 0.8351 |
| 20.0 | -12.5 | 53,981 | 0.9317 | 0.8880 |
| 27.5 | -5.0 | 57,218 | 0.9876 | 0.9152 |
| 32.5 | +0.0 | 57,938 | 1.0000 | 0.9212 |
| 37.5 | +5.0 | 57,220 | 0.9876 | 0.9150 |
| 44.0 | +11.5 | 54,545 | 0.9414 | 0.8919 |
| 55.0 | +22.5 | 48,131 | 0.8307 | 0.8344 |
| no season at all (flat plan): 43,626, share 0.7530, fill 0.8042 |
Show the full program
# Chapter 6. p61: what a phase error costs a weekly newsvendor
# ILLUSTRATIVE perishable seasonal line (same demand curve as p52:
# 30 + 12.0 E[max(0, T - 18)] units a day, true lag 32.5 days, 26
# weeks from d = -60 after Xiazhi). Weekly demand is normal with mean
# mu and sd 0.25 mu. Price 10, unit cost 6, salvage 3 (made-up), so
# the critical fractile is (10 - 6) / (10 - 3). Each week the buyer
# orders Q = m + z s where m is the forecast under an assumed lag l
# and s = 0.25 m (the newsvendor rule of Arrow, Harris and Marschak
# 1951, see also B-211). Expected sales mu - sigma L(z) with the
# normal loss L(z) = phi(z) - z (1 - Phi(z)); no stock carries over.
import math
YEAR = 365.2422
W = 2 * math.pi / YEAR
PRICE, COST, SALVAGE = 10.0, 6.0, 3.0
CV = 0.25
TRUE_LAG = 32.5
def phi(z):
return math.exp(-0.5 * z * z) / math.sqrt(2 * math.pi)
def cdf(z):
return 0.5 * (1 + math.erf(z / math.sqrt(2)))
def inv_cdf(p):
lo, hi = -10.0, 10.0
for _ in range(200):
mid = (lo + hi) / 2
if cdf(mid) < p:
lo = mid
else:
hi = mid
return (lo + hi) / 2
def pos_part(mu, s):
return mu * cdf(mu / s) + s * phi(mu / s)
def weekly(lag, first=-60, weeks=26):
out = []
for w in range(weeks):
days = []
for i in range(7):
d = first + 7 * w + i
m = 14.0 + 14.0 * math.cos(W * (d - lag))
days.append(30 + 12.0 * pos_part(m - 18, 3.0))
out.append(math.fsum(days))
return out
Z = inv_cdf((PRICE - COST) / (PRICE - SALVAGE))
def week_profit(q, mu):
sigma = CV * mu
z = (q - mu) / sigma
sold = mu - sigma * (phi(z) - z * (1 - cdf(z)))
return PRICE * sold + SALVAGE * (q - sold) - COST * q, sold
def season(plan, truth):
prof, sold = [], []
for m, mu in zip(plan, truth):
p, s = week_profit(m * (1 + Z * CV), mu)
prof.append(p)
sold.append(s)
return math.fsum(prof), math.fsum(sold)
if __name__ == "__main__":
truth = weekly(TRUE_LAG)
demand = math.fsum(truth)
best, _ = season(truth, truth)
print("critical fractile {:.4f}, z = {:.4f}".format(
(PRICE - COST) / (PRICE - SALVAGE), Z))
print("assumed lag error season profit share of best fill rate")
for lag in (0.0, 10.0, 20.0, 27.5, 32.5, 37.5, 44.0, 55.0):
p, s = season(weekly(lag), truth)
print("{:11.1f} {:+5.1f} {:13,.0f} {:13.4f} {:9.4f}".format(
lag, lag - TRUE_LAG, p, p / best, s / demand))
flat, s = season([demand / 26] * 26, truth)
print("no season at all (flat plan): {:,.0f}, share {:.4f}, fill {:.4f}"
.format(flat, flat / best, s / demand))Single source and citation
Fan, Y. (2026). Temperature Phase Lag across the Twenty-Four Solar Terms, First-Order Thermal Inertia behind the Dog Days and Seasonal Demand Forecasting (Version 1.0.0), Chapter 6: The Price of a Phase Error: Order Timing under the Newsvendor Model. 5D Library. DOI pending
DOI pending · monograph page goes live after publication · 5DL-B-232 · v1.0.0 · CC-BY-NC-ND-4.0
BibTeX
@book{fan2026232,
author = {Fan, Yafu},
title = {Temperature Phase Lag across the Twenty-Four Solar Terms, First-Order Thermal Inertia behind the Dog Days and Seasonal Demand Forecasting},
year = {2026},
publisher = {5D Library},
edition = {1.0.0},
note = {DOI pending}
}Other chapter answers in this book
- Chapter 1 · The Solstice Is Not the Hottest Day: First-Order Thermal Inertia and the Phase Lag arctan(ωτ)
- Chapter 2 · Fifteen Degrees a Step: Solar Longitude, the Twenty-Four Terms and the Sinusoid of Sunshine
- Chapter 3 · The Arithmetic of the Dog Days: the Geng-Day Rule, the Heat Window and Thermal Mass
- Chapter 4 · Harmonic Regression: Estimating Amplitude and Phase from Daily Readings
- Chapter 5 · The Phase of Demand: Regressing Demand on Temperature, and the Misplaced Nominal Season
- Chapter 7 · Classical Sources East and West: the Shi Xun Chapter of the Yi Zhou Shu and Hesiod's Works and Days
- Chapter 8 · Closing the Loop: the Solar-Term Order Calendar, Store Scheduling and a Pre-Registered Test