What does Cross-Border Dual Sourcing and Disruption Options conclude, in numbers, about “Supply-Disruption Real Options: Reserved Capacity, Exchange-Rate Switching and Keeping a Supplier Warm”?

Answer: Chapter 5 prices reserved capacity: at a disruption probability of 0.10 the critical reservation fee is 11.2, and the exchange-rate switching right is worth only 1.317 a unit at an annual volatility of 0.10 over 1 year.

Scope of the numbers: Its prices, lead times, outage frequencies, margins and capacities are illustrative; all calculations are generated by its programs; the book is not individual legal, tax or financial advice. Marked boxes separate published evidence, runnable Python calculations (20 programs), classical sources and the author's hypotheses.

中文版

Data table

The numbers below are printed verbatim by the chapter's Python program and can be reproduced by running it. standard-library Python onlyprinted values that match the answer: 0.10, 11.2

pifeeK*_formulaK*_gridoption_valuefee_paidnet_value
0.051.03713.5371018389371014679
0.053.03327.733301762299907632
0.056.00.00000
0.0510.00.00000
0.101.03811.1381036930381033120
0.103.03618.83620365521086025692
0.106.03327.73330352451998015265
0.1010.02736.3274030361274002961
0.201.03861.9386073936386070076
0.203.03761.73760737341128062454
0.206.03618.83620731042172051384
0.2010.03428.53430715873430037287
pi 0.05: no reservation pays once the fee reaches 5.6
pi 0.10: no reservation pays once the fee reaches 11.2
pi 0.20: no reservation pays once the fee reaches 22.4
Show the full program
# Chapter 5. p51: reserved near capacity priced as a real option.
# Model: the season of p42 (demand normal(3600, 600), price 220, salvage
# 60, far 100 paid on arrival and missing the season with probability
# pi). The firm may reserve K units of near capacity at a fee r a unit,
# paid whatever happens; if the far shipment fails it calls up to K units
# at the exercise price 108. Option value V(K) = expected extra profit
# from the right to call. Marginal value: pi * (112 - 160 * Phi(z_K)),
# so the best K solves Phi(z_K) = (112 - r / pi) / 160 and no capacity
# is worth reserving once r >= 112 * pi. Grid check of 10 units.
# All parameters illustrative.
import math
from statistics import NormalDist

N01 = NormalDist()
MU, SIG, PRICE, SALV, EX = 3600.0, 600.0, 220.0, 60.0, 108.0


def sales(q):
    z = (q - MU) / SIG
    return MU - SIG * (N01.pdf(z) - z * (1.0 - N01.cdf(z)))


def call_value(k):
    # 远源断供时近源调用 min(K, 报童水平) 件的利润
    target = MU + SIG * N01.inv_cdf((PRICE - EX) / (PRICE - SALV))
    q = min(k, target)
    s = sales(q)
    return math.fsum([PRICE * s, SALV * (q - s), -EX * q])


print("pi    fee  K*_formula  K*_grid  option_value  fee_paid  net_value")
for pi in (0.05, 0.10, 0.20):
    for r in (1.0, 3.0, 6.0, 10.0):
        frac = (112.0 - r / pi) / 160.0
        kf = MU + SIG * N01.inv_cdf(frac) if 0.0 < frac < 1.0 else 0.0
        kg = max((10.0 * j for j in range(0, 501)),
                 key=lambda k: (pi * call_value(k) - r * k, -k))
        v = max(0.0, pi * call_value(kg))
        print("%.2f %5.1f %10.1f %8.0f %13.0f %9.0f %10.0f"
              % (pi, r, kf, kg, v, r * kg, v - r * kg))
for pi in (0.05, 0.10, 0.20):
    print("pi %.2f: no reservation pays once the fee reaches %.1f"
          % (pi, 112.0 * pi))

Single source and citation

Fan, Y. (2026). Dual-Source Redundancy and Supply-Disruption Real Options in Cross-Border Chains: Optimal Safety Stock and Source Splits under Shipping Delays and Customs Variability (Version 1.0.0), Chapter 5: Supply-Disruption Real Options: Reserved Capacity, Exchange-Rate Switching and Keeping a Supplier Warm. 5D Library. DOI pending

DOI pending · monograph page goes live after publication · 5DL-B-291 · v1.0.0 · CC-BY-NC-ND-4.0

BibTeX
@book{fan2026291,
  author    = {Fan, Yafu},
  title     = {Dual-Source Redundancy and Supply-Disruption Real Options in Cross-Border Chains: Optimal Safety Stock and Source Splits under Shipping Delays and Customs Variability},
  year      = {2026},
  publisher = {5D Library},
  edition   = {1.0.0},
  note      = {DOI pending}
}

Other chapter answers in this book