What does Cross-Border Dual Sourcing and Disruption Options conclude, in numbers, about “Lead-Time Variance: the Term Deleted from the Safety-Stock Formula”?

Answer: Chapter 1 shows that with a far lead-time standard deviation of 10 days, stock set by the demand-only formula delivers a nominal 95 % service level of only 0.701 in fact. In Chapter 2's annual ledger the dual split saves 8323 a year against the best single far-source plan, while a naive ledger of landed prices reaches the opposite conclusion; a parameter map shows that with short outages the single far source is still the lowest-cost option.

Scope of the numbers: Its prices, lead times, outage frequencies, margins and capacities are illustrative; all calculations are generated by its programs; the book is not individual legal, tax or financial advice. Marked boxes separate published evidence, runnable Python calculations (20 programs), classical sources and the author's hypotheses.

中文版

Data table

The numbers below are printed verbatim by the chapter's Python program and can be reproduced by running it. standard-library Python onlyprinted values that match the answer: 0.701, 95

simulated lead time: mean 40.05 d, sd 10.03 d
rulesafetyreorderCSLfillshort/cycle
demand-only124.91727.10.7010.7791123.72
full formula671.92274.10.9190.966618.70
exact 95% pct787.22389.40.9500.979911.27
share of cycles with lead time >= 55 d: 0.1128
Show the full program
# Chapter 1. p12: what service the demand-only formula really delivers.
# Model: 20,000 replenishment cycles. Lead time in whole days = 28 days
# of transit + a gamma delay (mean 8, sd 6) + 20 days with probability
# 0.2 (customs inspection). Daily demand normal(40, 12). Reorder point
# R = 40 * E[L] + SS; a cycle is "covered" if lead-time demand <= R.
# Fill rate uses an order size of 560 units (14 days of demand).
# Fixed seed; all parameters illustrative.
import math
import random
from statistics import NormalDist

rng = random.Random(20261113)
D, SD, Q = 40.0, 12.0, 560.0
K_SHAPE = (8.0 / 6.0) ** 2
THETA = 8.0 / K_SHAPE
N = 20000


def lead_time():
    lt = 28.0 + rng.gammavariate(K_SHAPE, THETA)
    if rng.random() < 0.2:
        lt += 20.0  # step: inspection adds 20 days
    return int(round(lt))


ld, lts = [], []
for _ in range(N):
    lt = lead_time()
    lts.append(lt)
    ld.append(math.fsum(rng.gauss(D, SD) for _ in range(lt)))

m_l = math.fsum(lts) / N
s_l = math.sqrt(math.fsum((x - m_l) ** 2 for x in lts) / (N - 1))
z = NormalDist().inv_cdf(0.95)
ss_only = z * SD * math.sqrt(m_l)
ss_full = z * math.sqrt(m_l * SD ** 2 + (D * s_l) ** 2)
srt = sorted(ld)
r_exact = srt[int(0.95 * N)]
print("simulated lead time: mean %.2f d, sd %.2f d" % (m_l, s_l))
print("rule             safety  reorder   CSL    fill   short/cycle")
for name, r in (("demand-only", D * m_l + ss_only),
                ("full formula", D * m_l + ss_full),
                ("exact 95% pct", r_exact)):
    covered = len([x for x in ld if x <= r]) / N
    short = math.fsum(max(0.0, x - r) for x in ld) / N
    print("%-15s %7.1f %8.1f %6.3f %7.4f %8.2f"
          % (name, r - D * m_l, r, covered, 1.0 - short / Q, short))
late = len([x for x in lts if x >= 55]) / N
print("share of cycles with lead time >= 55 d: %.4f" % late)

Single source and citation

Fan, Y. (2026). Dual-Source Redundancy and Supply-Disruption Real Options in Cross-Border Chains: Optimal Safety Stock and Source Splits under Shipping Delays and Customs Variability (Version 1.0.0), Chapter 1: Lead-Time Variance: the Term Deleted from the Safety-Stock Formula. 5D Library. DOI pending

DOI pending · monograph page goes live after publication · 5DL-B-291 · v1.0.0 · CC-BY-NC-ND-4.0

BibTeX
@book{fan2026291,
  author    = {Fan, Yafu},
  title     = {Dual-Source Redundancy and Supply-Disruption Real Options in Cross-Border Chains: Optimal Safety Stock and Source Splits under Shipping Delays and Customs Variability},
  year      = {2026},
  publisher = {5D Library},
  edition   = {1.0.0},
  note      = {DOI pending}
}

Other chapter answers in this book