What does Implied Volatility, Skew and Vertical Spreads conclude, in numbers, about “The Bear Put Vertical Spread: Geometry, Costs and Early Exercise”?

Answer: With a 3 % interest rate and 30 days left, the early-exercise premium of the 100-strike American put is 0.246 when the underlying is at 80 (where the American price is just the intrinsic value of 20) and only 0.015 at the money; immediate exercise is optimal below 88.6, and with seven days left the critical price rises to 93.4. At 8 % interest both the premium and the critical price are higher (0.052 at the money; critical prices 91.1 and 94.6), because receiving the strike early earns more interest.

Scope of the numbers: Marked boxes separate published evidence, runnable Python calculations (16 programs), classical sources and the author's models and hypotheses; every price and trade in the book is fictional or illustrative.

中文版

Data table

The numbers below are printed verbatim by the chapter's Python program and can be reproduced by running it. standard-library Python onlyprinted values that match the answer: 0.015, 0.052, 0.246, 100, 30, 80

r3 %, put K = 100, vol 0.22, 30 days: S European American premium
8019.754 20.000 0.246
909.883 10.023 0.140
955.526 5.578 0.052
1002.391 2.407 0.015
exercise now is optimal below S88.6 (30 d), 93.4 (7 d)
r8 %, put K = 100, vol 0.22, 30 days: S European American premium
8019.345 20.000 0.655
909.495 10.000 0.505
955.207 5.392 0.186
1002.193 2.246 0.052
exercise now is optimal below S91.1 (30 d), 94.6 (7 d)
100/95 spread, r3 %, 30 days: S European American legs difference
804.972 5.000 +0.028
904.243 4.336 +0.093
952.983 3.021 +0.039
1001.518 1.530 +0.012
payoff if the short 95 put is assigned at S85 and the long 100 put is exercised
at once: (100 - 85) - (95 - 85)5 = spread width; max loss stays the debit

Key formula

\[\text{payoff}(S_T) = \max(K_1 - S_T, 0) - \max(K_2 - S_T, 0) = \min\big(\max(K_1 - S_T, 0),\ K_1 - K_2\big).\]
Show the full program
# American versus European puts on a non-dividend-paying underlying (CRR tree, 600
# steps): the early-exercise premium, the critical price below which exercise is optimal,
# and what early assignment of the short leg does to a 100/95 bear put spread.
import math

def ncdf(x):
    return 0.5 * (1.0 + math.erf(x / math.sqrt(2.0)))

def euro_put(S, K, T, r, s):
    d1 = (math.log(S / K) + (r + 0.5 * s * s) * T) / (s * math.sqrt(T))
    return K * math.exp(-r * T) * ncdf(-d1 + s * math.sqrt(T)) - S * ncdf(-d1)

def amer_put(S, K, T, r, s, n=600):
    dt = T / n; u = math.exp(s * math.sqrt(dt)); d = 1 / u
    p = (math.exp(r * dt) - d) / (u - d); disc = math.exp(-r * dt)
    v = [max(K - S * u ** j * d ** (n - j), 0.0) for j in range(n + 1)]
    for i in range(n - 1, -1, -1):
        v = [max(disc * (p * v[j + 1] + (1 - p) * v[j]), K - S * u ** j * d ** (i - j))
             for j in range(i + 1)]
    return v[0]

def critical(K, T, r, s):
    lo, hi = 1.0, K                     # largest S at which exercising now is optimal
    for _ in range(40):
        mid = 0.5 * (lo + hi)
        ex = amer_put(mid, K, T, r, s, 300) <= K - mid + 1e-9
        lo, hi = (mid, hi) if ex else (lo, mid)
    return lo

if __name__ == "__main__":
    s = 0.22
    for r in (0.03, 0.08):
        print(f"r = {100 * r:.0f} %, put K = 100, vol {s}, 30 days: S  European American"
              "  premium")
        for S in (80, 90, 95, 100):
            e, a = euro_put(S, 100, 30 / 365, r, s), amer_put(S, 100, 30 / 365, r, s)
            print(f"{'':39s}{S:3d}   {e:7.3f}  {max(e, a):7.3f}   {a - e:6.3f}")
        cr = ", ".join(f"{critical(100, d / 365, r, s):.1f} ({d} d)" for d in (30, 7))
        print(f"  exercise now is optimal below S = {cr}")
    r = 0.03; T = 30 / 365
    print("100/95 spread, r = 3 %, 30 days:   S   European  American legs  difference")
    for S in (80, 90, 95, 100):
        e = euro_put(S, 100, T, r, 0.22) - euro_put(S, 95, T, r, 0.245)
        a = amer_put(S, 100, T, r, 0.22) - amer_put(S, 95, T, r, 0.245)
        print(f"{'':34s}{S:3d}   {e:7.3f}   {a:7.3f}         {a - e:+.3f}")
    print("payoff if the short 95 put is assigned at S = 85 and the long 100 put is"
          " exercised")
    print(f"  at once: (100 - 85) - (95 - 85) = {(100 - 85) - (95 - 85)} = spread width;"
          " max loss stays the debit")

Single source and citation

Fan, Y. (2026). Implied Volatility Surfaces, Skew Premia and Quantitative Risk Control of Vertical Spreads (Version 1.0.0), Chapter 3: The Bear Put Vertical Spread: Geometry, Costs and Early Exercise. 5D Library. https://doi.org/10.5281/zenodo.23796765

DOI: 10.5281/zenodo.23796765 · Read the monograph · 5DL-B-038 · v1.0.0 · CC-BY-NC-ND-4.0

BibTeX
@book{fan2026038,
  author    = {Fan, Yafu},
  title     = {Implied Volatility Surfaces, Skew Premia and Quantitative Risk Control of Vertical Spreads},
  year      = {2026},
  publisher = {5D Library},
  edition   = {1.0.0},
  doi       = {10.5281/zenodo.23796765},
  url       = {https://doi.org/10.5281/zenodo.23796765}
}

Other chapter answers in this book