What does Bottlenecks, Cannibalization and Advisory Pricing conclude, in numbers, about “A Fixed Base Fee plus a Share of the Gain: Contracts under Double Moral Hazard”?
Answer: Chapter 5 solves for the share under double moral hazard (about 0.214) and shows that only annual reconciliation deters hiding the gain (audit probability 0.893).
Scope of the numbers: Team capacities, demand parameters, margins, noise and contract parameters are illustrative or synthetic; all data are generated by its programs; the book is not investment, legal or tax advice. Marked boxes separate published evidence, runnable Python calculations (16 programs), classical sources and the author's hypotheses.
Data table
The numbers below are printed verbatim by the chapter's Python program and can be reproduced by running it. printed values that match the answer: 0.214
| noise sd | beta* | surplus at: beta* | 0.20 | 0.50 | fee only |
| 10 | 0.261 | 54.7 | 54.4 | 50.8 | 50.0 |
| 40 | 0.214 | 53.9 | 53.8 | 47.0 | 50.0 |
| 80 | 0.136 | 52.5 | 51.9 | 35.0 | 50.0 |
| at sigma 40: base fee RM 8.1k + 21.4% of gain; | |||||
| expected gain RM 86.3k/month, client keeps RM 28.9k |
Key formula
Show the full program
# Chapter 5. p09: Fixed base fee plus a share beta of the measured gain,
# with moral hazard on BOTH sides (Bhattacharyya-Lafontaine). Monthly
# gain G = a*e_c + b*e_f + noise (RM thousand), noise sd sigma; the
# consultant's effort e_c and the client's own implementation effort e_f
# each cost e^2/2; the consultant is risk averse (CARA, r per RM 1k).
# The consultant picks e_c = beta*a, the client e_f = (1 - beta)*b, and
# the joint certainty-equivalent surplus is maximised at
# beta* = a^2 / (a^2 + b^2 + r*sigma^2).
# The base fee F then gives the consultant a certainty equivalent of 25.
A, B, R, CE = 6.0, 10.0, 0.02, 25.0
def surplus(beta, sigma):
ec, ef = beta * A, (1 - beta) * B
return A * ec + B * ef - ec ** 2 / 2 - ef ** 2 / 2 \
- R * beta ** 2 * sigma ** 2 / 2
def base_fee(beta, sigma):
ec, ef = beta * A, (1 - beta) * B
gain = A * ec + B * ef
return CE - beta * gain + ec ** 2 / 2 + R * beta ** 2 * sigma ** 2 / 2
def best(sigma):
return A ** 2 / (A ** 2 + B ** 2 + R * sigma ** 2)
if __name__ == "__main__":
print(" noise sd beta* surplus at: beta* 0.20 0.50 fee only")
for sigma in (10.0, 40.0, 80.0):
b = best(sigma)
print(" {:7.0f} {:6.3f} {:16.1f} {:5.1f} {:5.1f} {:7.1f}"
.format(sigma, b, surplus(b, sigma), surplus(0.2, sigma),
surplus(0.5, sigma), surplus(0.0, sigma)))
s = 40.0
b = best(s)
print(" at sigma 40: base fee RM {:.1f}k + {:.1%} of gain;".format(
base_fee(b, s), b))
print(" expected gain RM {:.1f}k/month, client keeps RM {:.1f}k".format(
A * b * A + B * (1 - b) * B,
A * b * A + B * (1 - b) * B - base_fee(b, s)
- b * (A * b * A + B * (1 - b) * B) - ((1 - b) * B) ** 2 / 2))Single source and citation
Fan, Y. (2026). Enterprise Bottleneck Diagnostics, SKU Cannibalization Audits and Automation Return Bounds (Version 1.0.0), Chapter 5: A Fixed Base Fee plus a Share of the Gain: Contracts under Double Moral Hazard. 5D Library. https://doi.org/10.5281/zenodo.24090217
DOI: 10.5281/zenodo.24090217 · Read the monograph · 5DL-B-083 · v1.0.0 · CC-BY-NC-ND-4.0
BibTeX
@book{fan2026083,
author = {Fan, Yafu},
title = {Enterprise Bottleneck Diagnostics, SKU Cannibalization Audits and Automation Return Bounds},
year = {2026},
publisher = {5D Library},
edition = {1.0.0},
doi = {10.5281/zenodo.24090217},
url = {https://doi.org/10.5281/zenodo.24090217}
}Other chapter answers in this book
- Chapter 1 · A Queueing Network of Four Teams and Its Bottleneck
- Chapter 2 · Work Pushed into the Bottleneck, Communication Channels and Variability
- Chapter 3 · Self-Cannibalization in a Product Line: Nested Logit and Diversion Ratios
- Chapter 4 · The Margin Dilution Matrix and the Limits of "Cut 30%"
- Chapter 6 · Paying for Results: Stepped Shares, Attitudes to Risk and Measuring the Baseline
- Chapter 7 · The Guanzi's "Cheng Ma" and "Qing Zhong II", Song Market Exchange and the Monopoly Goods Bureau, and the Han Feizi's "Holding the Name to the Reality"
- Chapter 8 · Finding the Bottleneck in the Logs, a Contract Ledger and a Pre-Registered Switchback Experiment