What does Dunbar Layers and Customer Half-Lives conclude, in numbers, about “Closing the Loop: Layered Contact for a Buyer's Private Channel, a VIP Care Calendar and a Plan for Refutation”?
Answer: Chapter 8 gives the layering procedure for a buyer's private channel, a VIP care calendar, the tool "Private-Channel Layer Scheduler" and a pre-registered test protocol. Marked boxes separate published evidence, runnable Python calculations (19 programs), classical sources and the author's hypotheses.
Scope of the numbers: Its layer floors, half-lives, weights and stop probabilities are illustrative; all calculations are generated by its programs; it is non-individualized business guidance, and its compliance rules yield to the law in force locally. Marked boxes separate published evidence, runnable Python calculations (19 programs), classical sources and the author's hypotheses.
Data table
The numbers below are printed verbatim by the chapter's Python program and can be reproduced by running it. standard-library Python onlyprinted values that match the answer: 19
| layer sizes of a 1500 list | 20 40 120 360 |
| budget 2.0 h/week scheduled | 20 40 24 0 |
| budget h/wk VIP core reg light sched respond-only used | |
| 0.5 | 7 0 0 0 7 1493 0.48 |
| 1.0 | 14 0 0 0 14 1486 0.96 |
| 2.0 | 20 40 24 0 84 1416 2.00 |
| 2.5 | 20 40 120 360 540 960 2.45 |
| 4.0 | 20 40 120 360 540 960 2.45 |
| half-life 30 d, 2.0 h/week | 19 0 0 0 |
| ratio 4, 2.0 h/week sizes | 20 60 240 960 |
| ratio 4, 2.0 h/week sched | 20 44 0 0 |
Show the full program
# Chapter 8. p82: the scheduler core shared with distill/tool.py
# Four cumulative layers inner * ratio ** k (20, 60, 180, 540 of a
# 1500 list), floors 0.8 / 0.6 / 0.4 / 0.2, half-life 60 days, beta
# 0.5, interval = max(T*, 7 days), minutes per touch 6 / 3 / 1 / 0.5
# (all illustrative, as in p32 and p61). The weekly budget is filled
# inner layer first and an outer layer gets nobody while an inner one
# is cut; whoever does not fit becomes respond-only. The
# same functions run in the tool; here the budget is swept.
import math
NAMES = ("VIP", "core", "regular", "light")
FLOORS = (0.8, 0.6, 0.4, 0.2)
def layer_sizes(total, inner, ratio):
sizes, prev = [], 0
for k in range(4):
cum = min(total, int(round(inner * ratio ** k)))
sizes.append(max(0, cum - prev))
prev = max(prev, cum)
return sizes
def t_star(floor, lam, beta):
return math.log((beta + floor * (1.0 - beta)) / floor) / lam
def plan(total=1500, inner=20, ratio=3.0, half_life=60.0, beta=0.5,
budget=2.0, cap_days=7.0, minutes=(6.0, 3.0, 1.0, 0.5)):
lam = math.log(2.0) / half_life
sizes = layer_sizes(total, inner, ratio)
keeps, used = [], []
for n, floor, mins in zip(sizes, FLOORS, minutes):
every = max(t_star(floor, lam, beta), cap_days)
per_person = 365.0 / every * mins / 60.0 / 52.0
left = max(0.0, budget - math.fsum(used))
keep = n if n * per_person <= left else int(left / per_person)
if keeps and keeps[-1] < sizes[len(keeps) - 1]:
keep = 0
used.append(keep * per_person)
keeps.append(keep)
return sizes, keeps, math.fsum(used)
def main():
sizes, keeps, used = plan()
print("layer sizes of a 1500 list: " + " ".join(map(str, sizes)))
print("budget 2.0 h/week scheduled: " + " ".join(map(str, keeps)))
print("budget h/wk VIP core reg light sched respond-only used")
for b in (0.5, 1.0, 2.0, 2.5, 4.0):
s, k, u = plan(budget=b)
tot = k[0] + k[1] + k[2] + k[3]
print("{:11.1f} {:4d} {:4d} {:4d} {:5d} {:6d} {:13d} {:5.2f}"
.format(b, k[0], k[1], k[2], k[3], tot, 1500 - tot, u))
s, k, u = plan(half_life=30.0, budget=2.0)
print("half-life 30 d, 2.0 h/week : " + " ".join(map(str, k)))
s, k, u = plan(ratio=4.0, budget=2.0)
print("ratio 4, 2.0 h/week sizes : " + " ".join(map(str, s)))
print("ratio 4, 2.0 h/week sched : " + " ".join(map(str, k)))
main()Single source and citation
Fan, Y. (2026). Dunbar's Layered Numbers, Relationship-Maintenance Time Budgets and the Decay Half-Life of Private-Channel Customers (Version 1.0.0), Chapter 8: Closing the Loop: Layered Contact for a Buyer's Private Channel, a VIP Care Calendar and a Plan for Refutation. 5D Library. DOI pending
DOI pending · monograph page goes live after publication · 5DL-B-231 · v1.0.0 · CC-BY-NC-ND-4.0
BibTeX
@book{fan2026231,
author = {Fan, Yafu},
title = {Dunbar's Layered Numbers, Relationship-Maintenance Time Budgets and the Decay Half-Life of Private-Channel Customers},
year = {2026},
publisher = {5D Library},
edition = {1.0.0},
note = {DOI pending}
}Other chapter answers in this book
- Chapter 1 · The Confidence Interval of 150: from a Neocortex Regression to an Envelope of Eight Models
- Chapter 2 · A Ratio of About Three: 5, 15, 50, 150 and the Robustness of Proportions
- Chapter 3 · Exponential Decay of Tie Strength: Half-Lives, Slide Times and Maintenance Intervals
- Chapter 4 · A Lagrangian Split of the Time Budget: Head Counts Are Computed, Not Decreed
- Chapter 5 · The Decay Half-Life of Private-Channel Customers: Why a Cohort's Half-Life Grows
- Chapter 6 · A Compliant Contact Schedule: Quiet Hours, Stop Means Stop and a Frequency Cap
- Chapter 7 · Classical Sources East and West: Confucius's Three Helpful Friends and Cicero's Measures of Salt