Acceptance Sampling Plans and Operating-Characteristic Curves: How Many Items a Buyer Must Inspect on Arrival: chapter answers

Buyers and resellers commonly believe that inspecting a tenth of every delivery is a fair and safe rule: more for large lots, less for small. This book overturns that belief with exact probabilities. Whether inspection stops bad lots depends on the number of items sampled and the number of defectives allowed, and hardly at all on the sample's share of the lot. The project blueprint attributed this claim to Dodge and Romig's 1929 paper in the Bell System Technical Journal; after checking, the book corrects the blueprint: that paper introduced the lot tolerance, the consumer's risk and the prin…

DOI pending · monograph page goes live after publication · 5DL-B-329 · 中文版

Illustrative model calculation, not a live quote